North Shore Medical Center - LEED Gold for Power Plant
The Central Utility Plant is a central boiler plant and combined heat & power system that provides heating, hot water, steam and electricity to the entire North Shore Medical Center. It will serve 1 million s/f of campus buildings and future planned additions. It is the first energy plant on the Atlantic coast to achieve LEED Gold and it has the distinction of having the highest efficiency amongst all certified power plants in the nation.
This state-of-the art CUP plant uses 65% less energy than the LEED standard ASHRAE 90.1-2007 earning all 19 points under optimize energy performance; houses two high pressure and three low pressure steam boilers all with low NOx burners and 820kW cogeneration unit and heat recovery system located on the roof. The CHP system is 100% base loaded with negligent waste heat and it provides annually 38% of the electricity and 33% of the steam for the all existing campus buildings. Other sustainable features include commitment to open space of the adjacent wetlands, white roof to reduce heat island effect on local environment and avoidance of materials that contain chemicals that are listed on Partners Health Care's hazardous chemicals list. North Shore Medical Center's new 72-bed addition, slated to be completed in 2017, will also be served by this energy plant.
Project Team Included:
Owner: North Shore Medical Center/Partners Healthcare
LEED/Sustainability Consultant: Richard Moore Env. Consulting
Architecture/Civil/Landscape: HDR
MEP/Energy Engineer: Engineered Solutions Inc.
Construction Manager: Turner Construction Co
Facilities Commissioning: SSR
NEREJ’s 2026 Mid Year Review Spotlight is underway. This special section will feature perspectives from across commercial real estate as firms reflect on the first half of the year and discuss the trends, challenges, and opportunities shaping the months ahead.
As we enter the spring of 2026, the Rhode Island industrial real estate market stands on stable footing, following several years of resilience fueled by constrained supply, steady demand, and dynamic economic conditions.
These are uncertain times for the home building industry. We have the threat of tariffs mixed with high interest rates and lenders nervous about the market. Every professional, whether builder, broker, or architect, asks themselves, how do we manage our business in today’s climate? We all strive not just to succeed, but
The Boston industrial market entered mid-2025 in a bifurcated state. Large-block vacancy remains elevated, while shallow-bay along the 495/128 corridor continues to prove resilient. Fieldstone’s focus on this geography positions us squarely in the middle of a renewal-driven, supply-constrained
Southern New Hampshire’s industrial market has always punched above its weight. For decades, the region has attracted a mix of advanced manufacturing, beverage and food producers, logistics operators, and specialty