John Moriarty & Assoc. to build Celtics’ 70,000 s/f practice facility at Boston Landing

May 20, 2016 - Construction Design & Engineering
Boston Celtics practice facility at Boston Landing - Brighton, Mass. Boston Celtics practice facility at Boston Landing - Brighton, Mass.

Brighton, MA The 17-time NBA Champion Boston Celtics and NB Development Group LLC said that Boston Landing will become the home of the Celtics’ new practice and training facility.

“We are proud to team with New Balance Development in the creation of a best-in-class athletic training and practice facility that will provide Celtics players, coaches, and training staff with the resources, technology, and programming to compete at the highest level in an increasingly competitive NBA landscape,” said Rich Gotham, president of the Boston Celtics. “The Boston Landing location will bring us closer to our game day home at the TD Garden while providing high impact brand visibility.”

The Boston Celtics practice facility will be the latest element at Boston Landing — at 55 feet in the air cantilevered out to the edge of the Mass Pike. The Celtics new practice home, including the team’s 17 NBA championship banners, will be highly visible from the Massachusetts Turnpike with a 40 foot glass wall enclosing the practice courts that face the approximately 130,000 daily commuters. The practice facility will encompass 70,000 s/f.

“We are thrilled to welcome the Boston Celtics to Boston Landing,” Jim Halliday, managing director for NB Development Group LLC.  “Adding another iconic brand like the Boston Celtics to Boston Landing at Allston-Brighton along the Mass Pike further advances the concept of Boston Landing serving as the gateway into the city of Boston from the west, while at the same time adding to the culture of health, wellness, and movement with this district.”

Features of the comprehensive practice facility will include:

• Two state-of-the-art parquet floor basketball courts where the team will practice

• Leading edge audio-visual technology throughout the facility

• Expanded strength and conditioning, training, and recovery facilities

• Best-in-class locker rooms and players’ lounge

• Physical therapy areas including hydrotherapy pools

• Sports science and nutrition facilities

• Expanded media work room, press conference and broadcast facilities

• A flexible hospitality area for guests and hosting community relations activities

• Work space for the team’s coaching and basketball front office staffs

Construction is estimated to begin at 40 Guest St. in the fall of 2016 with completion for the spring of 2018. Elkus Manfredi Architects will handle the design and John Moriarty & Associates will handle the construction. Participating brokers from Transwestern/RBJ included Steve Purpura and Chris McCauley representing NB Development Group and Michael Joyce and Tom Ashe representing the Boston Celtics.

The team’s current practice facility at Healthpoint in Waltham has served as the Celtics practice home since 1999.

Boston Landing is a 15-acre mixed-use development in the Allston-Brighton neighborhood of Boston that includes the new world headquarters of New Balance Athletics, Inc. and the Boston Bruins practice facility. A commuter rail station will be completed on the Framingham-Worcester line during spring of 2017. In addition, the development includes additional office buildings, retail and restaurant space, a hotel and a sports complex.

Tags:

Comments

Add Comment