News: Construction Design & Engineering

Bond Brothers completes Dartmouth College's $93 million Class of 1978 Life Sciences Center

Bond Brothers completed the new Dartmouth College Class of 1978 Life Science Center. The 174,000 s/f laboratory and academic building includes 30 wet labs with support space, 30 faculty offices, 6 post doc offices, conference rooms and lounges. The building also includes a 200 seat theater classroom, 80 seat amphitheater classroom, teaching labs and flexible classrooms with an interior glass stair tower. The exterior is made up of brick, copper and a granite base. "It is really exciting to be part of a state of the art facility that will forever impact the way in which science is taught at Dartmouth," said Bond president Robert Murray. "We are proud to have played a role in building this state of the art science center that will benefit the students and faculty at Dartmouth." The $93 million project was designed by Bohlin Cywinski Jackson to achieve LEED Platinum Certification. Its sustainable features include a 6,000 s/f greenhouse and storm water management system that is expected to reuse one million gallons of rainwater annually, as well as an energy management system. The building is viewed by the college to be a national model of sustainability using less than ½ of the energy of the best performing labs in the country. The sustainability aspects carried over into the design of the project as well with a combination of brick, granite and copper used within the building's envelop which will diminish thermal exposure. Bond implemented a customized quality control process along with a performance mockup targeted at the envelop installation to ensure that these materials provided weather tightness with a longer term goal of ensuring that the sustainability model was upheld.
MORE FROM Construction Design & Engineering

Shawmut Design and Construction joins Draper to break ground on 111,000 s/f IMPACT Center in Lowell

Lowell, MA Shawmut Design and Construction, a $2.3 billion national construction management firm, joined Draper, Wexford Science & Technology, and state and local leaders to break ground on Draper’s Integrated Microelectronics Production & Advanced Chip Technology (IMPACT) Center
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Breathing easier: Elevating indoor air quality and performance in New England commercial spaces - by David Capra

Breathing easier: Elevating indoor air quality and performance in New England commercial spaces - by David Capra

cross the New England commercial real estate landscape, from urban life sciences hubs in Greater Boston to academic research facilities throughout the region, the metrics defining high-performing buildings are shifting. Tenants, developers, and facility owners are placing a renewed focus on an invisible yet vital asset: indoor air quality (IAQ).
Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

After several years of planning, construction, and anticipation, the community is eagerly awaiting the opening of the Greenwood Credit Union City Hall Plaza and outdoor skating rink later this month.
ABC-Mass. chairman’s message:  Rent control isn’t the answer to our housing crisis - by Luiza Mills

ABC-Mass. chairman’s message: Rent control isn’t the answer to our housing crisis - by Luiza Mills

As you may know, Massachusetts voters will be weighing in on a number of ballot initiatives in November. Among them is a proposal to impose the nation’s strictest statewide rent control policy. I’d like to tell you why the ABC MA Board
Navigating tariffs and material  uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

Navigating tariffs and material uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

As headlines around tariffs seem to dominate the news daily, many considering construction projects have anticipated major cost escalations and widespread supply issues. While tariffs haven’t driven pricing spikes to the extent once feared, the lasting impact has been a new layer of uncertainty, affecting more than just budgets.