News: Construction Design & Engineering

Kripper Studio engaged by Boston University on three design projects

Boston University’s Charles River Campus - Photo Credit: Bob O’Connor for Boston University Photography.

Boston, MA Kripper Studio has been engaged by Boston University on three design improvement projects across different departments on the Charles River Campus location. The projects range from converting the use of spaces to upgrading technology to re-configuring interiors and include offices, a screening room and student residences. The three initial projects are:

• 640 Commonwealth Ave. - Boston University’s College of Communication screening room: Located in a building constructed in 1912, the main screening room was last renovated in 1988. The screening room’s capabilities will be enhanced, the overall comfort and aesthetics improved and ADA requirements met. Scope of work includes all ceiling tiles, sub-structure, carpeting, wall finishes, lighting, and seating to be removed and replaced with new elements. The existing podium and staging will be removed and replaced with a new movable podium for increased programming flexibility when using the room. Similarly, new lighting throughout will enable a more flexible approach based on programming. Sustainably, all existing AV and sound equipment to be preserved and protected. All existing doors to remain and be primed and painted. Start date on construction will soon be determined. 

• 665 Commonwealth Ave. -  Boston University’s Department of Computer Science: Focusing on floors 13, 14, 15 and 16 in a building that was completed in 2022, Kripper Studio will convert previously open-meeting spaces into purposely-configured workspaces. This effort represents the first re-adaption of some of the floors reflecting a changing need and the assessment of existing facilities. Start date on construction will soon be determined. 

• 113 Bay State Rd.: Located in a brownstone originally constructed in 1905 and previously housing six separate student residences across three floors, Kripper Studio will begin with the upper two floors to renovate into two separate, entire floor residences. The upper floors are currently vacant and work is to begin this summer. Anticipated completion is this fall.

Each project aligns with Boston University and Kripper Studio’s shared interest in upgrading existing structures and interiors for current needs. 

Within hundred-year-old buildings and newly constructed buildings, the realignment of needs with existing real estate can be accomplished with strategic and thoughtful accuracy. The intended improvements to classrooms, residences and offices will benefit students and faculty. 

“The opportunity to support Boston University as it assesses current needs and existing facilities is also an opportunity to anticipate future needs,” said Amir Kripper, founding principal of Kripper Studio. “We share an understanding that to work with existing structures is to recognize the value of what has already been created and to now springboard to what can efficiently be added for future uses.”

MORE FROM Construction Design & Engineering

Timberline Construction Corp. completes renovations for Neurology and Infusion Center of New England

Foxborough, MA Timberline Construction Corp. (Timberline) has completed a 20,000 s/f healthcare construction project for the Neurology and Infusion Center of New England at 18 Washington St. The full interior renovation transforms an existing two-story medical office building into a purpose-built outpatient care environment that doubles the center’s clinical footprint, expands services and positions the growing practice for its next chapter.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
ABC-Mass. chairman’s message:  Rent control isn’t the answer to our housing crisis - by Luiza Mills

ABC-Mass. chairman’s message: Rent control isn’t the answer to our housing crisis - by Luiza Mills

As you may know, Massachusetts voters will be weighing in on a number of ballot initiatives in November. Among them is a proposal to impose the nation’s strictest statewide rent control policy. I’d like to tell you why the ABC MA Board
It’s time to lead: Confronting mental health in construction - by David Watts

It’s time to lead: Confronting mental health in construction - by David Watts

As we close Mental Health Awareness Month, we must be clear: May isn’t just about ribbons, hashtags, or lunchtime mindfulness apps. It’s about responsibility to confront hard truths that linger in silence, and to challenge ourselves, as leaders in our industry, to do more.
Navigating tariffs and material  uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

Navigating tariffs and material uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

As headlines around tariffs seem to dominate the news daily, many considering construction projects have anticipated major cost escalations and widespread supply issues. While tariffs haven’t driven pricing spikes to the extent once feared, the lasting impact has been a new layer of uncertainty, affecting more than just budgets.
Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

After several years of planning, construction, and anticipation, the community is eagerly awaiting the opening of the Greenwood Credit Union City Hall Plaza and outdoor skating rink later this month.