News: Owners Developers & Managers

North Branch receives Building of the Year Award

Hooksett, NH The New Hampshire Chapter of the U.S. Green Building Council presented North Branch Construction with their Building of the Year Award for the NHARNG Field Maintenance Shop at the NH Chapter’s Virtual Annual Meeting on December 3rd. Also receiving the award for this project are Smith Alvarez Sienkiewycz Architects of Burlington, VT, architectural  designers for the project and the state of New Hampshire/NHARNG. 

North Branch constructed the 27,200 s/f facility to achieve Silver Level LEED certification by USGBC. The project, earning a total of 58 points in the Silver level LEED certification process, was the highest scoring project certified in New Hampshire and was the third highest scoring Silver level LEED project certified in the United States in 2020.

Twenty-three categories of LEED credits were utilized throughout construction to realize the Silver Level LEED certification. Maximum scores were achieved in eighteen different categories, including Optimize Energy Performance, On-site renewable energy, Construction IAQ Management Plan – during construction, enhanced commissioning, construction waste management, recycled content, regional materials, Alternative Transportation – low emitting and fuel-efficient vehicles and bicycle storage and changing rooms, Site Development – maximize open space, water efficient landscaping, Low-emitting materials – adhesives and sealants, paints and coatings, flooring systems, Controllability of systems – lighting and thermal comfort, Increased ventilation, and Daylight and views – views.

Specific examples of materials and techniques implemented on the project include the over 11,000 cubic yards of ledge that were blasted on the project with 100% of the material blasted being processed and recycled for use onsite. The building is powered by a renewable energy source in the form of a photo-voltaic solar panel system. Additional LEED credits were realized through the use of regional materials; recycled steel; water-efficient landscaping and charging stations for electric cars.

The field maintenance building, located along Route 3 in Hooksett, NH, includes a six-bay garage with overhead crane maintenance capabilities, a drive-through wash bay, a tool storage room, offices, classrooms, and gym and shower facilities. 

 

MORE FROM Owners Developers & Managers

Crescent Village Shopping Center trades to new owner for $1.75 million

Monroe, CT Crescent Village Shopping Center located at 115 Main St. has been sold to new owners. The multi-building retail center sold for $1.75 million or just under $142.00 per ft. The three buildings total 12,340 s/f on 1.54 acres
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Florida ruling raises bar for condo terminations and buyouts - by Michael Karsch

Florida ruling raises bar for condo terminations and buyouts - by Michael Karsch

On October 14, 2025, in a landmark decision with significant implications for the Florida real estate market, the Supreme Court of Florida formally denied Two Roads Development’s (TRD Biscayne LLC) petition for review in its long-running case against unit owners of Biscayne 21,
Retail infill strategy to activate Pawtucket’s Conant Thread District - by Gaetan Kashala

Retail infill strategy to activate Pawtucket’s Conant Thread District - by Gaetan Kashala

Until recently, the Conant Thread District consisted of approximately 150 acres of underutilized industrial land spanning Pawtucket and Central Falls. Today, the area is one of the most significant
Revitalized Town Centers:  Retail??? - by Carol Todreas

Revitalized Town Centers: Retail??? - by Carol Todreas

It is now widely accepted that customers want to shop in person at physical stores. Brands know that they do better business in a physical store than just on line so they want to open stores. Demand for retail space by digital merchants, local entrepreneurs, and newly developed national chains
IREM president’s message:  Our new reality - Staying ahead of supply chain delays - by Yoany Vargas

IREM president’s message: Our new reality - Staying ahead of supply chain delays - by Yoany Vargas

Supply chain delays are slowing construction, ratcheting up operating costs, and extending turnover timelines across Greater Boston, directly reducing revenue and increasing the workload for multifamily and