Andover, MA DPS Group has been selected by Oncorus, Inc. to design a 88,000 s/f Good Manufacturing Practice (GMP) viral immunotherapy clinical manufacturing facility on the Innovation Park campus located at 4 Corporate Dr.
Allston, MA The award-winning global engineering and consulting practice Buro Happold has completed work for Harvard University’s new Science and Engineering Complex, designed by architecture firm Behnisch Architekten.
Somerville, MA Kaplan Construction has completed CALA, a 91,000 s/f adaptive reuse of the former Powder House Community School. Located at 1060 Broadway, CALA is an inclusive, intergenerational urban village with 48 residences with accessible green space.
Water damage is one of the most frequent and expensive property loss claims filed each year for commercial properties including office buildings, industrial complexes, retail outlets, mixed-use developments, and hotel properties.
Pembroke, MA According to Acella Construction Corp., a leader in construction management throughout greater Boston, completed its 18
th year participating in the Rodman Ride for Kids
Boston, MA Shawmut Design and Construction has completed a $115 million expansion and renovation of Boston University’s Henry M. Goldman School of Dental Medicine (GDSM). The project broke ground in early 2018 after a seven-year planning period and was completed in July 2021.
Haverhill, MA Edwards Vacuum, in collaboration with Marwick Associates, Equity Industrial Partners and Dacon, broke ground on the new 135,000 s/f manufacturing center of excellence. Specializing in technical products that utilize cryogenics for semiconductor manufacturing
Gloucester, MA When R+D firm Hefring Engineering sought to leave its temporary office space in Boston and establish a headquarters that fit its ocean-centric mission, a newly-built spec office building in the city fit the bill.
Norton, MA According to Condyne Capital Partners and Polar Design Build, the tilt up walls are ready for install at Home Depot warehouse. All site work has been completed including the laying of utilities, foundation poured, and ground has been leveled.
Andover, MA Thirty-six years after completing its first job at the Boston Marriott in Copley Sq., JM Electrical Company, Inc., (JME) has hit a major milestone with the completion of its 20,000t
h project. The landmark project was carried out for Sarepta Therapeutics