News: Owners Developers & Managers

Small and medium firms are choosing flex tech space in lieu of traditional office environments - by Bill Norton

Bill Norton, Norton Asset Management Bill Norton, Norton Asset Management

Currently there is a significant tightening of supply for small to medium industrial users in New Hampshire. “Industrial” is a catch-all phrase for “high-bay” space. Years ago, 16’ clear was high-bay - not so today. Now these buildings are sometimes described as flex tech, where assembly, R&D, light fabrication, office and shipping all are on the same floor.

True high bay today is no less than 20’ clear (clear meaning the vertical height from the concrete floor to the underside of the lighting, sprinkler pipes and HVAC duct work). This can accommodate racking that can stack three pallets high. But for firms involved with inventories and significant distribution, four high pallet racking is becoming the norm. This results in 30’ high buildings as the steel frame needs to be more substantial and the mechanicals are bigger given the bigger volume within the cube itself.

We at Norton Asset Management and Harrington & Reeves have several properties listed, as well as several assignments (tenant rep and/or buyer broker). I am working with one R&D prototype firm looking to begin production of organic-based pharmaceuticals. They want to buy a 10,000 s/f facility, 20% office, 18’ clear, one or two loading docks and newer, “clean” construction (no lead paint of any kind). Looking throughout Central and Southern New Hampshire, this has been a challenging task. There are many larger buildings (20,000-50,000 s/f) and there are many smaller units (2,000-3,000 s/f industrial condos), while much of the existing inventory is for lease only.

We also have a listing for a 36,000-40,000 s/f industrial building (10 units of 3,600 s/f each, each with additional mezzanine space). This property is no longer in an industrial zone and was owned by a catalog sales distribution company. So, under current zoning, it could be warehouse distribution or commercial or light assembly but not real manufacturing, nor with any significant outside storage.

These types of buildings are relatively expensive to build today given current land cost and building code requirements ($65-$90 per s/f).

Thus, the inventory/supply has been constrained somewhat since the Great Recession of 2009. So we sometimes feel that pinch. One other contributing factor is the softness of the overall office market.  Many 21st century small and medium firms, especially those in tech fields, are choosing flex tech environments in lieu of more traditional offices. Open concepts, tech friendly workstations, pods, nodes, working in teams - all of these current concepts are chipping away at 20th century office properties.  The result is more competition for the former “industrial” space.

Bill Norton, CRE, FMA is the president at Norton Asset Management, Inc., Manchester, NH.

READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Revitalized Town Centers:  Retail??? - by Carol Todreas

Revitalized Town Centers: Retail??? - by Carol Todreas

It is now widely accepted that customers want to shop in person at physical stores. Brands know that they do better business in a physical store than just on line so they want to open stores. Demand for retail space by digital merchants, local entrepreneurs, and newly developed national chains
Florida ruling raises bar for condo terminations and buyouts - by Michael Karsch

Florida ruling raises bar for condo terminations and buyouts - by Michael Karsch

On October 14, 2025, in a landmark decision with significant implications for the Florida real estate market, the Supreme Court of Florida formally denied Two Roads Development’s (TRD Biscayne LLC) petition for review in its long-running case against unit owners of Biscayne 21,
IREM president’s message:  Our new reality - Staying ahead of supply chain delays - by Yoany Vargas

IREM president’s message: Our new reality - Staying ahead of supply chain delays - by Yoany Vargas

Supply chain delays are slowing construction, ratcheting up operating costs, and extending turnover timelines across Greater Boston, directly reducing revenue and increasing the workload for multifamily and

Retail infill strategy to activate Pawtucket’s Conant Thread District - by Gaetan Kashala

Retail infill strategy to activate Pawtucket’s Conant Thread District - by Gaetan Kashala

Until recently, the Conant Thread District consisted of approximately 150 acres of underutilized industrial land spanning Pawtucket and Central Falls. Today, the area is one of the most significant