Construction Design & Engineering

ADD Inc designs new library for Dartmouth College's medical school

ADD Inc was tasked with designing the temporary space for Dartmouth College's Dana Biomedical Library. The short-term home for the college's...

Donovan joins BOND as vice president of healthcare

BOND has added Shawn Donovan as vice president. A 35-year veteran of the Boston construction industry, Donovan's depth of experience and exp...

DiGiorgio Assoc. completes design of D'Youville Life and Wellness Community

DiGiorgio Associates Inc. (DAI) recently completed the design of new assisted living residences and a memory care residence for D'Youville L...

Levi + Wong Design Associates helps Boston Medical Center develop master plan

Boston Medical Center (BMC) is a 496 bed, 2.5 million s/f, private, not-for-profit, academic medical center. In a city ripe with world class...

Bowdoin Construction completes 30,000 s/f fit-out for Thoratec Corp.

Bowdoin Construction recently completed a 30,000 s/f fit-out of offices and lab space for Thoratec Corp. The project, designed by Facility P...

Lee Kennedy Co. uses Lean building to expedite delivery of Envoy Hotel Boston

Lee Kennedy Co. is incorporating Lean building practices into the planning and management of the new Envoy Hotel construction. This 136 key ...

Wayne J. Griffin Electric provides services for 456,000 s/f Avalon Natick project: Callahan, Inc. serves as construction manager for 424 apartment units

Wayne J. Griffin Electric, Inc. (Griffin Electric) has recently completed the electrical installation work at Avalon Natick. Part of AvalonB...

Burnes of HallKeen Management receives Paul Tsongas Award from Preservation Mass.

Andrew Burnes, president and CEO of HallKeen Management, was honored with the Paul E. Tsongas award from Preservation Massachusetts at their...

Brothers and Nitsch of Nitsch Engineering receive EY Entrepreneur of the Year 2014 Award

Nitsch Engineering president and CEO Lisa Brothers, PE, LEED AP BD+C, and founding principal and chairman Judith Nitsch, PE, LEED AP BD+C, r...

Suffolk Construction selected for phase 1 of Stilts Infill Master Plan for Lahey Hospital & Medical Center project

Suffolk Construction has been selected to perform preconstruction and construction management services for phase one of the Stilts Infill Ma...