News: Construction Design & Engineering

VIVO Architecture designs 25,000 s/f new space for ModeX Therapeutics at Riverside Labs

Weston, MA VIVO Architecture has designed a new space for ModeX Therapeutics at Riverside Labs.

With a usable area of 25,000 s/f, ModeX is currently a full-floor tenant on the second floor of Riverside Labs. The facility, developed by Greatland Realty Partners, was a perfect fit for an innovation driven company such as ModeX. The building’s “L” shaped floorplate allowed VIVO Architecture to maintain a close connection between the research labs and the office areas, with multiple points of access stitching together the various work zones. There is even access to the lab directly from the reception room, underscoring the prominence of the R&D spaces within the suite.

Approximately 60% of the area is dedicated to the research labs, which are in turn separated into three distinct lab control zones. The design allows the company’s 160 staff, which include both research and operations, to be consolidated under one roof.

The project team included the following:

• Architect : VIVO Architecture

• MEP Consultant : Cosentini Associates

• Construction Manager : Shawmut Design and Construction;

• Landlord: Greatland Realty Partners;

• Owner’s Project Manager: Newmark;

• Electrical/ Fire Alarm: Reilly Electrical Contractors;

• HVAC: Phoenix Mechanical Contractors;

• Fire Protection: Professional Fire Systems;

•Lab Casework: New England Lab Casework;

• Furniture: Environments at Work; and

• Demountable Partitions: Infinium Wall Systems.

ModeX Therapeutics is focused on developing and providing treatments for cancers and infectious diseases. Dedicated to the development of multispecific biologics (products made from substances found in living things with multiple binding targets that can be engaged simultaneously), ModeX is a leading developer of treatments with unprecedented versatility to tackle complex diseases.

MORE FROM Construction Design & Engineering

Timberline Construction Corp. completes renovations for Neurology and Infusion Center of New England

Foxborough, MA Timberline Construction Corp. (Timberline) has completed a 20,000 s/f healthcare construction project for the Neurology and Infusion Center of New England at 18 Washington St. The full interior renovation transforms an existing two-story medical office building into a purpose-built outpatient care environment that doubles the center’s clinical footprint, expands services and positions the growing practice for its next chapter.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
ABC-Mass. chairman’s message:  Rent control isn’t the answer to our housing crisis - by Luiza Mills

ABC-Mass. chairman’s message: Rent control isn’t the answer to our housing crisis - by Luiza Mills

As you may know, Massachusetts voters will be weighing in on a number of ballot initiatives in November. Among them is a proposal to impose the nation’s strictest statewide rent control policy. I’d like to tell you why the ABC MA Board
Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

After several years of planning, construction, and anticipation, the community is eagerly awaiting the opening of the Greenwood Credit Union City Hall Plaza and outdoor skating rink later this month.
It’s time to lead: Confronting mental health in construction - by David Watts

It’s time to lead: Confronting mental health in construction - by David Watts

As we close Mental Health Awareness Month, we must be clear: May isn’t just about ribbons, hashtags, or lunchtime mindfulness apps. It’s about responsibility to confront hard truths that linger in silence, and to challenge ourselves, as leaders in our industry, to do more.
Navigating tariffs and material  uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

Navigating tariffs and material uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

As headlines around tariffs seem to dominate the news daily, many considering construction projects have anticipated major cost escalations and widespread supply issues. While tariffs haven’t driven pricing spikes to the extent once feared, the lasting impact has been a new layer of uncertainty, affecting more than just budgets.