News: Construction Design & Engineering

Corderman completes 35,000 s/f Flex by BXP at Hub on Causeway

Boston, MA Construction is now complete on Flex by BXP, a new 35,000 s/f full floor first class flexible office space in the 31-story Phase III office tower at Hub on Causeway for developer Boston Properties. Corderman & Company provided construction management services on the project.

The $6 million project on floor 3, in collaboration with architecture and interior design creative agency Design Farm, provides tenants with short-term, modular, plug-and-play space solution in an inspiring open industrial environment. Work stations are easily adaptable to accommodate a variety of business functions. Flex by BXP features: open ceilings, polished concrete hallways, and high-bay light fixtures. Power and data are delivered under a raised access flooring system. A floating Kinetics puck concrete slab mitigates sound disruption. An edgy common amenity area echoes the building’s structural bracing and includes a full kitchen with casual seating. The space offers views of the Leonard P. Zakim Bunker Hill Memorial Bridge and the city. 

The 630,000 s/f Phase III tower, with anchor tenant Verizon having leased 450,000 s/f, is set for completion in 2021.

The $1.1 billion Hub on Causeway development is located next to TD Garden and North Station. Several parts of the 1.87 million s/f mixed-use 24/7 neighborhood community hub have recently opened including: the 25,000 s/f Banners Kitchen & Tap, Guy Fieri’s Latin American-inspired Tequila Cocina, the 270-room citizenM hotel, 1,500-person Big Night Live music venue, a Star Market urban grocery store, 270-foot long North Station pedestrian connector tunnel, the transformation and expansion of TD Garden, a TD Garden and North Station entrance and outdoor space, North Station garage expansion with more than 500 below grade parking spaces, software company Rapid7’s new 145,000 s/f world headquarters, and the first two phases of the expansive office tower. Now under construction is the 38-story Hub50House residential tower, 15-screen ArcLight Cinemas, and Hub Hall food hall.    

Flex by BXP is one of numerous offices that are either complete or underway by Corderman & Co. This includes spaces for: Cybereason, Catalant Technologies, Venture Lane, Neoscape, Placester, Ideo, Enzyvant, Summit Growth Partners, Orrick Herrington & Sutcliffe, Goulston & Storrs, and Kensington Capital. 

Corderman’s project team is comprised of: senior project manager John Million, assistant project manager Jim Tully, construction superintendent Steve Giordano, and laborer Kevin Carmody.

MORE FROM Construction Design & Engineering

Timberline Construction Corp. completes renovations for Neurology and Infusion Center of New England

Foxborough, MA Timberline Construction Corp. (Timberline) has completed a 20,000 s/f healthcare construction project for the Neurology and Infusion Center of New England at 18 Washington St. The full interior renovation transforms an existing two-story medical office building into a purpose-built outpatient care environment that doubles the center’s clinical footprint, expands services and positions the growing practice for its next chapter.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
ABC-Mass. chairman’s message:  Rent control isn’t the answer to our housing crisis - by Luiza Mills

ABC-Mass. chairman’s message: Rent control isn’t the answer to our housing crisis - by Luiza Mills

As you may know, Massachusetts voters will be weighing in on a number of ballot initiatives in November. Among them is a proposal to impose the nation’s strictest statewide rent control policy. I’d like to tell you why the ABC MA Board
Navigating tariffs and material  uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

Navigating tariffs and material uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

As headlines around tariffs seem to dominate the news daily, many considering construction projects have anticipated major cost escalations and widespread supply issues. While tariffs haven’t driven pricing spikes to the extent once feared, the lasting impact has been a new layer of uncertainty, affecting more than just budgets.
It’s time to lead: Confronting mental health in construction - by David Watts

It’s time to lead: Confronting mental health in construction - by David Watts

As we close Mental Health Awareness Month, we must be clear: May isn’t just about ribbons, hashtags, or lunchtime mindfulness apps. It’s about responsibility to confront hard truths that linger in silence, and to challenge ourselves, as leaders in our industry, to do more.
Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

After several years of planning, construction, and anticipation, the community is eagerly awaiting the opening of the Greenwood Credit Union City Hall Plaza and outdoor skating rink later this month.