Salem, MA Callahan Construction Managers (Callahan) was selected to manage the ground-up reconstruction of the Leefort Terrace Affordable Housing complex. When complete, Leefort will provide both existing and future residents with access to 124 eco-friendly, affordable apartments that will also be Passive House certified and 100% electric and solar powered.
Boston, MA Margulies Perruzzi (MP) has hired Edward Marcey, AIA, as healthcare studio leader. Marcey will provide staff leadership as well as project management and quality assurance for the healthcare studio. He will also be responsible for maintaining and establishing new relationships with clients and industry partners.
Andover, MA Vantage Builders, Inc. has announced the completion of a corporate headquarters expansion for NEOLab, a full-service orthodontic laboratory and leader in digital innovation. The 10,000 s/f project had a strict deadline, which the Vantage team successfully met by utilizing a design-build model.
Newton, MA VBA Construction Management completed new office space for Barclay Water Management, a provider of industrial and commercial water treatment solutions. Located at Chapel Bridge Park, an historic 1850s mill building, the project was 5,800 s/f.
Raynham, MA DJSA Architecture PC has promoted Christina Cimino to project manager. In this role, Cimino, who previously held the title of assistant project manager, leads projects from conception to implementation, oversees the project design and construction process,
Boston, MA Studio G Architects has promoted eight members of the team that are critical to the success of the firm. Steve Michener and Gabriela Shelburne have been promoted to principal. Michener has been with the company since 2007 and has proven to be a key member with the design and technical execution of education and civic projects.
Andover, MA Erland Construction, in partnership with Ellenzweig and real estate developer IQHQ, have transformed One Corporate Dr. The project involved the construction of a 59,994 s/f addition and the renovation of 68,215 s/f of existing space, creating a cutting-edge life science headquarters.
Danvers, MA According to Hancock Associates, Joseph Peznola, P.E. has been promoted to vice president of engineering. Peznola has nearly 35 years of industry experience and has been an engineer at Hancock Associates for over 20 years.
New Bedford, MA Colantonio Inc. has been named general contractor for the $24 million renovation and restoration of the historic Zeiterion Performing Arts Center.
Boston, MA Weston & Sampson and Rivermoor Energy have been selected, as a team, by the Massachusetts Department of Transportation (MassDOT) for the development of the National Electric Vehicle Infrastructure (NEVI)’s ultra-fast electric vehicle (EV) charging stations on Massachusetts’ roadways.