News: Construction Design & Engineering

Pro Con completes framing for $13.5 million Alta at Indian Woods

The framing is complete on the three buildings that comprise Alta at Indian Woods a new energy star residential apartment community being built on Stagecoach Rd. Wood Partners is the developer and Pro Con, Inc is the architect and general contractor for the $13.5 million design build project. Wainwright Bank & Trust Company of Boston is providing the project financing. "The framing is complete, the rough mechanicals are underway and we plan to begin dry walling by mid-July," said the project manager for Pro Con. "All the buildings will be weather tight by the mid -August and ready for final finishes." Alta at Indian Woods is participating in the Massachusetts New Homes with Energy Star program. Energy Star for New Homes is a program developed and administered by the U.S. Department of Energy that focuses on a high efficiency building envelope and optimal HVAC distribution performance. The project design calls for an inch of rigid insulation on the exterior, slab edge and under-slab insulation, and high performance cavity insulation; window U-values of .3; and ducts that surpass the standard for tightness. Conservation Services Group is collaborating with Wood Ptrs. as HERS rater on the project. The Energy Star standard, when implemented and tested by approved rating firms, is designed to reduce energy consumption to a level that is 15% lower than a comparable project built to the 1994 International Residential Code. The 154-apartment community will offer one and two bedroom units and one-bedroom units with dens. The apartments, ranging from 710 to 1,041 s/f with various design configurations, will be located in three, four-story garden-style buildings. The apartments will feature kitchens, full size washers and dryers, walk-in closets, upgraded flooring and high-speed internet and cable ready access. The community's common areas will be landscaped and will offer outdoor seating and gas grilles. The community's club house will feature a great room with a kitchen for entertaining and a fitness room with high end exercise equipment and machines. The community's administrative and leasing offices will be located on site. The site work which includes utility infrastructure, roadways, parking lots, drainage and landscaping is on-going. Pro Con has scheduled a phased completion of the project; the first building will be ready for occupancy in November 2010 and second and third buildings will be completed in January 2011.
MORE FROM Construction Design & Engineering

Timberline Construction Corp. completes renovations for Neurology and Infusion Center of New England

Foxborough, MA Timberline Construction Corp. (Timberline) has completed a 20,000 s/f healthcare construction project for the Neurology and Infusion Center of New England at 18 Washington St. The full interior renovation transforms an existing two-story medical office building into a purpose-built outpatient care environment that doubles the center’s clinical footprint, expands services and positions the growing practice for its next chapter.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
ABC-Mass. chairman’s message:  Rent control isn’t the answer to our housing crisis - by Luiza Mills

ABC-Mass. chairman’s message: Rent control isn’t the answer to our housing crisis - by Luiza Mills

As you may know, Massachusetts voters will be weighing in on a number of ballot initiatives in November. Among them is a proposal to impose the nation’s strictest statewide rent control policy. I’d like to tell you why the ABC MA Board
It’s time to lead: Confronting mental health in construction - by David Watts

It’s time to lead: Confronting mental health in construction - by David Watts

As we close Mental Health Awareness Month, we must be clear: May isn’t just about ribbons, hashtags, or lunchtime mindfulness apps. It’s about responsibility to confront hard truths that linger in silence, and to challenge ourselves, as leaders in our industry, to do more.
Navigating tariffs and material  uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

Navigating tariffs and material uncertainty in today’s construction market - by Karl Ginand and Tiffany Gallo

As headlines around tariffs seem to dominate the news daily, many considering construction projects have anticipated major cost escalations and widespread supply issues. While tariffs haven’t driven pricing spikes to the extent once feared, the lasting impact has been a new layer of uncertainty, affecting more than just budgets.
Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

Greenwood Credit Union City Hall Plaza nears completion - by Frank Picozzi

After several years of planning, construction, and anticipation, the community is eagerly awaiting the opening of the Greenwood Credit Union City Hall Plaza and outdoor skating rink later this month.